Our proposals
An outline planning application is being prepared. This aims to confirm the principle of the redevelopment of the industrial estate and how it will meet local planning policy. It will include:
Remediation of contaminated land
Removal of asbestos
Quantity of new floorspace
Height of new buildings
Access for pedestrians, cyclists and vehicles
Improving the public street frontage along Lincoln Road
Careful design of the boundary with the Lincoln Way residential area
Areas which will be landscaped
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud.
The environmental aspects of the proposal are also being assessed, including traffic, air quality, noise and ecology.
The outline planning application will not cover the specific design detail of the buildings that will eventually be constructed. A Parameter Plan shows the amount of development, its maximum size and points of access. In addition, illustrative site layouts show how the development could be accommodated on the site in the future.
You can download the parameter plan and the illustrative site layouts we are proposing using the links below:
Illustrative Layout Plan Option 1
Illustrative Layout Plan Option 2
Illustrative Layout Plan Option 3
Illustrative Layout Plan Option 4a (Lower Floors)
Illustrative Layout Plan Option 4a (Upper Floors)
Illustrative Layout Plan Option 4b (Ground and First Floor)
Illustrative Layout Plan Option 4b (Second and Third Floor)
Illustrative Layout Plan Option 4b (Fourth Floor)
Illustrative Layout Plan Option 5a
Illustrative Layout Plan Option 5b
After the outline planning stage, more detailed proposals will need to be prepared as ‘reserved matters’ and tailored to the needs of the specific businesses that would take space here. The reserved matters application(s) which will follow the outline stage are not the subject of this consultation process and the forthcoming planning application. These more detailed proposals will include the final design of the new buildings.
PROJECT TIMELINE
2024
Prepare outline planning application
2025
Outline planning application
2025
Prepare detailed proposal
2026
Reserved matters application
2028
Construction of new buildings
2029
Occupation by businesses